皇冠信用网(www.hg108.vip):Govt to focus on putting LCS project back on track, says Hishammuddin

新闻电报群www.tel8.vip)是一个Telegram群组分享平台。新闻电报群包括新闻电报群、telegram群组索引、Telegram群组导航、新加坡telegram群组、telegram中文群组、telegram群组(其他)、Telegram 美国 群组、telegram群组爬虫、电报群 科学上网、小飞机 怎么 加 群、tg群等内容。新闻电报群为广大电报用户提供各种电报群组/电报频道/电报机器人导航服务。

Senior Defence Minister Hishammuddin Tun Hussein says he never tires of asserting many times that the Defence Ministry and him have nothing to hide. – The Malaysian Insight file pic, August 13, 2022.

THE government will focus on putting the littoral combat ship (LCS) project back on track as decided by the Cabinet, said Senior Defence Minister Hishammuddin Tun Hussein in a post on Facebook.

He said negotiations with vendors, original equipment manufacturers (OEM) and banks are being carried out.

,

皇冠信用网www.hg108.vip)是一个开放皇冠信用网即时比分、皇冠信用网开户的平台。皇冠信用网平台(www.hg108.vip)提供最新皇冠信用网登录,皇冠信用网APP下载包含新皇冠体育代理、会员APP,提供皇冠信用网代理开户、皇冠信用网会员开户业务。

,

Hishammuddin said this in relation to the procurement of the combat ships which became controversial following the report of the Public Accounts Committee (Pac) revealing that not a single ship had been completed even though the project contract worth RM6.083 billion stipulated that five of the six ships should be completed and handed over by August 2022.

In the posting, Hishamuddin said his team has taken media personnel to Boustead Naval Shipyard in Lumut, Perak today to take a look at the external and internal conditions of the LCS which is under construction.

“I never get tired of asserting many times that the Defence Ministry and I have nothing to hide. At the same time, the wrongdoers must be brought to justice,” he added. – Bernama, August 13, 2022.


转载说明:本文转载自Sunbet。

  • 评论列表:

添加回复:

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。